![]() with better than 11,000electrical outlets, and featuring more than 2,000 slot machines, 55 gaming tables, fourteen commercial grade kitchens supporting five restaurants and a night club.Īccording to Roger Oertli, EVP Missouri Operations, “We knew that Pinnacle’s desire to reflect the latest trends in gaming would necessitate a very fluid design process throughout the project.” He was right, design changes were frequent and substantial, leading to a host of installation challenges requiring thorough documentation and administration. Everything about the River City was large scale, most notably the facility’s truly monumental game room at 90,000 sq. Guarantee provided design and value-engineering, and coordinated installation of all power, lighting, security and data systems for the full-service casino entertainment venue. The same tool set helped to bring the project in successfully in just 12 months, allowing the casino to open in early March 2010. It began with GECO’s innovative constructability modeling that served as a catalyst in winning the 17-month new construction contract for Pinnacle Entertainment’s $351 million, 90,000-square-foot casino in south St. Alert planning supported by advanced technology coupled with a can-do attitude led to Guarantee’s nomination for an AGC Keystone Award for the company’s turnkey electrical installation of the River City Casino.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |